DATA CENTER CONSTRUCTION
CRACs, switchgear, and busway set on battery power.
Zero-emission lithium machines place mechanical and electrical equipment inside live and under-construction data halls: no fumes near sensitive equipment, precise remote-control placement between racks and over raised floor.
WHAT DECIDES THE MACHINE
▪Raised-floor and slab loading limits drive machine weight
▪Zero-emission requirements inside conditioned space
▪Clearances through security corridors and equipment yards
▪Coordination windows: many picks happen during commissioning
Machines we'd start with
PRELIMINARY · FINAL SELECTION VERIFIED AGAINST LOAD CHARTS + SITE ACCESSDoing data centers?
Send the load weight, height, radius, and access dimensions; we verify the pick against the load chart and quote delivery with the machine.
AUTHORIZED JEKKO DEALER
AUTHORIZED HYRAX DEALER


